IEC 61010
 
IEC 61010

Company News

Rated Impulse Voltage: Why 2500 V Is Not a Number You Get to Pick

A 230 V laboratory instrument is tested for a rated impulse withstand of 2500 V. Designers sometimes assume this is generous, and design to 1500 V because a similar product passed. The two numbers are not two opinions about the same requirement. They belong to different overvoltage categories, and the category is decided by where the product is installed.

Where the number comes from

Insulation coordination starts from two inputs: the nominal voltage of the circuit, and the overvoltage category of the installation. From those, a table gives the rated impulse voltage the insulation must withstand.

For a 300 V circuit (the band that contains 230 V mains), the usual values are 1500 V for category I, 2500 V for category II, 4000 V for category III and 6000 V for category IV.

CategoryWhere the product sitsImpulse at 300 V
Iprotected, filtered supply1500 V
IIappliance socket, portable2500 V
IIIfixed installation, distribution4000 V
IVorigin of the installation6000 V

What an impulse is, physically

The test applies a 1.2/50 microsecond waveform: a rise to peak in 1.2 microseconds and a decay to half value in 50 microseconds. It is not a steady overvoltage. It is what arrives on a mains conductor when lightning strikes the distribution network or when a large inductive load switches.

That waveform matters because it stresses insulation differently from a 50 Hz test at the same peak. The rise time is short enough that the voltage distribution across an insulation system is capacitive rather than resistive: the first turns of a transformer winding, the first millimetres of a creepage path, and the air gap all see voltages set by their capacitance, not their resistance.

An insulation system that is uniform in resistance can still flash over, because the transient divides unevenly.

Why a category cannot be chosen for convenience

The category is not a design parameter. It describes the electrical environment the product will be connected to, and the product does not get to change that environment.

An instrument with a mains plug is category II because it is plugged into a socket in a building installation. It is not category I even if the design includes a filter, because category I is for circuits where overvoltages are already limited by the installation.

A product permanently wired into a distribution board is category III for its mains input, whatever its electronics do downstream. That single fact can move the required impulse withstand from 2500 V to 4000 V and change every clearance in the input section.

Where designs get caught

Three situations, all common:

Copying a portable design into a fixed installation. The circuit is identical and the category is not, so the input clearances are 40 percent too small.

Assuming the filter protects the product. An EMI filter limits what leaves the product, not what arrives. Its capacitors may actually couple a fast transient further into the circuit.

Measuring clearances at the wrong place. The impulse requirement applies across the insulation between circuits of different categories. A mains-to-earth gap and a mains-to-signal gap can carry different requirements even at the same physical distance.

Solid insulation changes the answer

For air gaps, the impulse voltage determines a minimum distance. For solid insulation, the requirement becomes a dielectric strength test, and thick solid insulation can meet a high impulse requirement in a smaller space than air.

That is why a potted or encapsulated input stage can be more compact than an open one, and why removing a potting compound to save cost can invalidate a clearance that was never in the air at all.

The test itself

Impulse testing is done with a generator that produces the specified waveform into the specified load, and the result is pass or fail on flashover or breakdown. Three practical points:

Polarity matters. The test is normally applied in both polarities, because insulation can be weaker in one direction, particularly where a semiconductor junction is in the path.

Number of impulses. The standard specifies a count, commonly three per polarity, and a single flashover is a failure. A product that fails on the third impulse has a marginal insulation, not a testing error.

Conditioning. Humidity conditioning before the test matters more for impulse than for AC, because surface contamination changes the capacitive division along a creepage path.

What to record

The nominal voltage and the overvoltage category assumed, the resulting rated impulse voltage and the clause it came from, the waveform and polarity used, and the pass or fail of each impulse. The category is the field that is most often missing and the one that decides whether the result means anything.

    Standard:       IEC 61032 IEC 60061 IEC 60335 IEC 60529 IEC 60068 IEC 60950 IEC 61010 IEC62368 IEC 60601
    TAG:
Test Probe Go Not Go Gauges Spring Impact Hammer Test Pin Probe Test Probe B Test Probe 18 IP Test Probe
 
Lampholder Gauges Lampcap Gauge Test Probe 11 UL Test Finger Probe Test Vessel Rigid Test Finger Impact Testing
test probe